SC-740 Stormtech Isolator Row

Filename:
SC-740 Stormtech Isolator Row.dwg

SC-740 Stormtech Isolator Row

This document details the SC-740 StormTech Isolator Row. Details, inspection port and inspection/maintenance steps included.

StormTech Isolator Row Plus detail diagram shows an optional inspection port, SC-740 end cap/chamber, elevated bypass manifold, sump depth, nyloplast, HDPE access pipe and geotextile layer between foundation stone and chambers.

The steps under inspection and maintenance require inspection of Isolator Row Plus for sediment, how to clean the Isolator Row Plus using the jetvac process, replacing covers, grates, filters and lids while recording observations and actions and inspection/cleaning basins and manholes upstream from the StormTech system.

A note suggests inspection occur every 6 months during the first year of operation and to adjust schedule based on observations of sediment. A maintenance note asks to conduct jetting and vactoring annually or when maintenance is necessary.

A 4” PVC inspection port detail shows the SC chamber. The concrete collar, asphalt overlay, StormTech chamber, nyloplast cover/frame, nyloplast inline drain, 4” SDR 35 pipe, 4” inserta TEE to be centered on corrugation crest, minimum width requirements with the chamber position underneath. A note suggests inspection ports may be connected through any chamber corrugation crest.

Looking for something else?

View Document Library